Risk Assessments

Risk Assessments

Risk assessments help us identify hazards, understand who may be harmed, assess the level of risk and apply suitable control measures before work begins. This page explains our approach to managing risk across construction, refurbishment, groundworks and associated services.

Company: Domiter Building Solutions LTD
Last updated: June 2026
Review: Annually or when work activities change
⚠

Hazard Identification

We identify hazards connected with the task, site, environment, equipment, materials and people affected by the work.

šŸ“Š

Risk Evaluation

Risks are considered by looking at how likely harm is and how serious the consequences could be.

šŸ›”

Control Measures

We apply practical control measures to eliminate hazards where possible or reduce risks to an acceptable level.

šŸ”

Review & Update

Assessments are reviewed when work changes, new hazards are identified or controls are no longer suitable.

01

Purpose Of Risk Assessments

The purpose of a risk assessment is to identify anything that could cause injury, illness, damage or disruption, then decide what reasonable steps are needed to prevent harm.

Domiter Building Solutions uses risk assessments to support safe planning, safe working methods, clear communication and better project control. Risk assessments are not just paperwork — they are a practical tool used to make informed decisions before and during work.

  • Identify hazards before work starts.
  • Consider who may be harmed and how.
  • Evaluate the level of risk.
  • Decide suitable control measures.
  • Communicate key controls to workers and subcontractors.
  • Record significant findings where required.
  • Review assessments when conditions change.
Practical aim: The goal is to prevent accidents, reduce exposure to hazards and make sure work is carried out in a controlled and professional way.
03

Our Risk Assessment Process

We follow a practical five-stage process based on recognised UK health and safety guidance.

01
⚠

Identify Hazards

Look for anything that could cause harm, including site conditions, work activities, materials, equipment and people nearby.

02
šŸ‘„

Who May Be Harmed

Consider workers, subcontractors, clients, visitors, other trades, occupants and members of the public.

03
šŸ“Š

Evaluate Risk

Assess likelihood and severity, then decide whether existing controls are enough.

04
šŸ›”

Control Risk

Apply suitable controls to eliminate hazards or reduce the risk to a reasonable level.

05
šŸ”

Record & Review

Record significant findings and review the assessment when conditions or work methods change.

04

Who May Be Harmed?

A risk assessment must consider everyone who could reasonably be affected by the work, not only the people carrying out the task.

šŸ‘·

Workers

Employees, labourers, operatives, supervisors and site workers directly involved in the task.

āš’

Subcontractors

Specialist trades, contractors and subcontractors working alongside or near our activities.

šŸ¢

Clients & Occupants

Property owners, tenants, staff, residents, customers or building users.

🚶

Visitors

Site visitors, delivery drivers, inspectors, consultants or client representatives.

šŸŒ

Public

Pedestrians, neighbours, road users or members of the public near the work area.

⚠

Vulnerable Persons

Children, elderly people, disabled persons, pregnant workers or those with specific needs.

05

Risk Rating Matrix

We may use a simple risk rating system to help prioritise controls. Risk is normally assessed by considering likelihood and severity.

Rating Likelihood Severity Example Meaning
1 Unlikely Minor Low chance of minor injury or inconvenience.
2 Possible Moderate Could occur and may cause injury requiring treatment or time away from work.
3 Likely Serious Realistic chance of serious injury, significant damage or major disruption.
4 Very likely Major High chance of major injury, serious harm or dangerous conditions.
5 Almost certain Severe Very high chance of severe injury, fatality or major incident if uncontrolled.

Low Risk

Controls are generally adequate. Monitor and maintain safe working.

Medium Risk

Additional controls may be required before or during the work.

High Risk

Work must not proceed until risks are reduced and controls are confirmed.

Important: A risk matrix is a guide. Professional judgement, site conditions and legal duties must always be considered. High-risk work requires stronger controls, clear supervision and suitable documentation.
06

Hierarchy Of Controls

When deciding how to control risk, we consider the hierarchy of controls. This means trying to remove the hazard first, then reducing exposure and only relying on PPE where other controls are not enough.

01

Eliminate

Remove the hazard completely where possible, such as avoiding unnecessary work at height.

02

Substitute

Replace a hazardous method, material or substance with a safer alternative.

03

Engineering Controls

Use barriers, guarding, extraction, dust suppression, mechanical aids or physical protection.

04

Administrative Controls

Use planning, supervision, exclusion zones, permits, training, signage and safe systems of work.

05

PPE

Use personal protective equipment where risks remain after other controls are applied.

07

Service-Specific Risk Assessment Areas

Different services involve different hazards. We consider the specific risks linked to the planned work activity.

šŸŽØ

Painting & Decorating

  • Working at height
  • Surface preparation dust
  • Paints, solvents and COSHH
  • Slip and trip hazards
  • Ventilation and drying conditions
✺

Spray Painting

  • Spray mist and fumes
  • Respiratory protection
  • Overspray protection
  • Fire and ignition risks
  • Ventilation and exclusion zones
šŸ—

Refurbishments

  • Existing defects
  • Other trades on site
  • Manual handling
  • Dust and waste
  • Live services and hidden hazards
🚜

Groundworks

  • Excavations and collapse risk
  • Underground services
  • Plant and vehicle movement
  • Manual handling of materials
  • Uneven ground and weather
↧

Drainage

  • Excavations and trenching
  • Contaminated water or waste
  • Confined or restricted access
  • Manual handling of pipes/chambers
  • Backfilling and reinstatement
āš’

Demolition & Strip-Out

  • Falling materials
  • Structural instability
  • Dust, noise and vibration
  • Sharp edges and debris
  • Waste removal and exclusion zones
ā–¦

Kitchen Installation

  • Manual handling of units/worktops
  • Cutting and drilling
  • Sharp tools and edges
  • Electrical/plumbing interface
  • Dust and housekeeping
🧽

Commercial Cleaning

  • Slips on wet floors
  • COSHH and cleaning chemicals
  • Manual handling
  • Waste and sharps risk
  • Occupied premises and public access
08

Common Hazards We Consider

The hazards considered will depend on the work activity and site conditions, but common construction and refurbishment hazards may include:

↕

Working At Height

Falls from ladders, steps, platforms, scaffolds, roofs or edges.

🚧

Excavations

Collapse, falls into trenches, buried services and unstable ground.

⚔

Electricity

Live cables, temporary electrics, damaged tools and hidden services.

šŸ’Ø

Dust & Fumes

Construction dust, spray mist, fumes, vapours and poor ventilation.

🧪

Substances

Paints, adhesives, solvents, cleaning chemicals, cement and COSHH risks.

šŸ‹

Manual Handling

Lifting, carrying, pushing, pulling and handling heavy or awkward materials.

šŸ”Š

Noise & Vibration

Cutting, drilling, breaking, demolition, plant and powered tools.

🧱

Falling Materials

Debris, tools, loose materials and overhead work activities.

🚶

Slips, Trips & Falls

Uneven ground, cables, debris, wet floors, poor lighting and access routes.

09

Recording Risk Assessment Findings

Where required, significant findings from risk assessments are recorded clearly so that the relevant people understand the hazards, risks and controls.

A risk assessment record may include:

Record item What it explains
Task or activity The work being assessed and where it will take place.
Hazards Anything that could cause harm, injury, illness, damage or disruption.
Who may be harmed Workers, subcontractors, clients, visitors, other trades or the public.
Existing controls Measures already in place to reduce risk.
Additional controls Further actions needed before or during the work.
Responsible person Who is responsible for making sure the control is implemented.
Review date When the assessment should be reviewed or updated.
HSE provides a risk assessment template that can be used to record who may be harmed and how, existing controls, further actions, who will carry them out and when action is needed.
10

Reviewing And Updating Risk Assessments

Risk assessments must remain relevant to the work being carried out. If conditions change, the assessment may no longer be suitable and should be reviewed.

We may review risk assessments:

  • Before a new project starts.
  • When the scope of work changes.
  • When site conditions change.
  • When new hazards are identified.
  • After an accident, incident or near miss.
  • When new equipment, materials or substances are introduced.
  • When weather conditions affect external works.
  • When a client, principal contractor or site manager requests an update.
Stop and review: If the work no longer matches the assessment, workers should stop, report the change and wait for the risk assessment or RAMS to be reviewed before continuing.
11

Responsibilities

Risk management works best when everyone understands their responsibilities.

Role Responsibilities
Director / Responsible Person Ensure suitable arrangements are in place for identifying hazards, assessing risks, preparing documentation and reviewing safety controls.
Site Supervisor / Lead Worker Check site conditions, brief workers, monitor controls, report changes and stop work if conditions become unsafe.
Workers Follow risk assessments, RAMS, site instructions and safe systems of work. Report hazards, defects, near misses and unsafe conditions.
Subcontractors Provide competent workers, follow site rules, cooperate with Domiter Building Solutions and supply their own RAMS where required.
Clients / Site Controllers Provide accurate site information, known hazards, access arrangements, asbestos information, site rules and cooperation with safe working.
12

Emergency Considerations

Risk assessments may include emergency considerations depending on the work activity and site conditions.

šŸš‘

First Aid

Identify first aid arrangements, responsible persons and emergency contact routes.

šŸ”„

Fire

Consider ignition sources, flammable materials, hot works, exits and assembly points.

šŸ’§

Spills

Plan how to contain and clean spills involving paints, fuels, oils or chemicals.

⚔

Utilities

Consider action required if live services, gas, water or electrical hazards are found.

☣

Hazardous Materials

Stop work and seek competent advice if asbestos or dangerous contamination is suspected.

šŸ“ž

Emergency Contact

Make sure the exact site address is available for emergency services if required.

13

Risk Assessment Contact

For project-specific risk assessments, RAMS, method statements or safety documentation requests, please contact Domiter Building Solutions.

Address

17 Firbeck Gardens,
Crewe, CW2 8UP,
United Kingdom

Project safety planning

Need A Project-Specific Risk Assessment?

Contact our team to discuss project hazards, site access, RAMS, method statements or health and safety documentation.

Send An Enquiry →
Scroll to Top
ā˜Ž Need help? Chat With Us
Home

Domiter Building
Solutions

Professional construction, refurbishment, groundworks and commercial support services across the UK and selected European locations.

Go To Homepage →
Professional Building Solutions

From Planning To Completion

Practical project support for residential, commercial, industrial and site-based work.

Send Enquiry →
Company

Reliable Building
Solutions

Learn more about Domiter Building Solutions, our working approach, project standards and how we support clients from planning to completion.

About Us →
UK & Europe

Built Around Reliable Delivery

Practical planning, professional communication and quality workmanship.

Contact Our Team →
Projects

Project Portfolio

This section showcase selected Domiter Building Solutions projects, including before-and-after photos, project descriptions, service categories and completed results.

View Projects →
Future Case Studies

Real Work, Real Results

Selected project examples will be added once client photos and project descriptions are available.

Discuss A Project →
Contact

Speak With
Our Team

Contact Domiter Building Solutions to discuss your project, request a quote, arrange a site visit or send project documents.

Send Enquiry →
Contact Details

Ready To Discuss Your Project?

We cover construction, refurbishment, groundworks, drainage, demolition, kitchen installation, cleaning and Tree & Garden.

Contact Page →